top of page

Salmon Creek Waste Water Treatment Plant

United Electric was the prime contractor on the project at the Salmon Creek Waste Water Treatment Plant. The project consisted of a 600A to 1200A generator upgrade as well as the replacement of the existing 2000A switch gear.

bottom of page